[ad_1]
One out of the three cables that have been broken in a hearth in Yuen Lengthy on Tuesday, which led to a power outage overnight for some 160,000 residents in western New Territories, has been reactivated, in accordance with a press launch by CLP Energy issued on Friday.
This comes after round 13,000 residents in Yuen Lengthy have been affected by additional energy failures on Thursday evening.
“After super effort by CLP Energy’s engineering groups in laying the three substitute 132kV high-voltage cables, the primary cable was efficiently energized at 3am as we speak,” the assertion learn.
“This new cable is ready to reinforce energy provide functionality and improve the reliability of the ability system within the area.”
It added that they aim to finish the cable laying works for the remaining two cables and have them activated on or earlier than subsequent Tuesday.
The facility firm apologized once more for the inconvenience triggered to the affected clients.
“We are going to proceed to carefully monitor the electrical energy provide within the area and organize redeployment if wanted,” it mentioned.
It added that clients can name its devoted hotline at 2728 8333 for enquiry.
The corporate mentioned that the second energy outage within the district in three days was brought on by the unstable electrical energy provide after the restoration {of electrical} providers in Yuen Lengthy, Tin Shui Wai and Tuen Mun on Wednesday.
Following the resumption of providers, CLP urged residents to avoid wasting power as the provision of electrical energy stays unstable.
However the metropolis has been going through a warmth wave since early this week, which is anticipated to proceed for a number of days.
A extremely popular climate warning, which was hoisted on Wednesday morning, stays in pressure.
The Hong Kong Observatory mentioned the town recorded its highest temperature of the year on Thursday.
The primary energy outage plunged the districts into darkness and prompted a suspension of prepare providers between Tsuen Wan West and Tuen Mun MTR stations of the Tuen Ma Line on Tuesday.
Some providers at hospitals within the districts have been additionally affected.
[ad_2]
Source link